EventsNewsLinksContact us
HomeSiteMapSearchContact Us
ERRA
 
 
Login

ERRA Training
ERRA Summer School
 
Renewables Section of the ERRA website Library

 

 

 


ERRA 10 Years Anniversary

 

 

 

 

Energy tariff data

 

 

 

 

 

 

 

 

JORDAN
Electricity Regulatory Commission (ERC)

 

country map

Latest News

For recent news on Jordan, please refer to http://www.erc.gov.jo

 

Key Statistics (2011)

Population                                                                                                              

6.249 Million

GDP/Capita

USD 4,615

Electricity market structure

Generation                                                                                                            

Hydro: 0.41%

Fossil fuel: 99.52%

RE: 0.07%

Electricity Market Size

14.593 TWh/year

Surplus Installed Capacity over Demand

760 MW

Net Electricity Importer

1653 GWh/year

Natural Gas Consumed

35193 bn BTU  

Natural Gas Imported

28472 bn BTU  

Summary:

  • Electricity Regulatory Commission was founded in 2001.
  • Organizstion structure: Council of Commissioners, formed by 5 Commissioners (Chairman, Deputy Chairman and three other Commissioners). Each Commissioner is appointed for a 4 years period (except for three Commissioners of the first Council in order to allow overlapping) and may be renewed for one additional 4 year period.
  • Number of Commissioner: 5
  • Number of staff: 81
  • ERC is financing is through License fees approximately 95%, other 5%

Responsibilities (in electricity):

  • Issuing of licenses in accordance with the provisions of the GEL
  • Establish the methodological basis for computing electric tariffs, subscription fees and connection charges to transmission and distribution systems.
  • Approve electric power meters installed by the licensees
  • Prescribe directives for inspection and testing of meters.
  • Ensure compliance by licensees with the terms of their licenses and other legal requirements, including directives issued.
  • Establish the appropriate operating codes and safety, security, and reliability standards and to assess the performance of the licensees.
  • Settle disputes arising between the licensees and consumers or between the licensees inter se.
  • Issue directives to ensure ERC obtains technical and financial data and any other information to conduct its mandates.
  • Prepare draft by-laws relating to the electricity sector.
  • Any other issues that the Chief-Commissioner thinks fit to present to the Council.
  • Issuing tariffs

 

Industry and Market Structure

Electricity Market Structure

  • 2002 General Electricity Law established a Single Buyer Model, allowing for future opening of the market when conditions for proper competition are met.
    • Generation Companies: 4 Companies (CEGCO , SAMRA , AES ( Al Manakher) and QEPCO ). SAMRA currently state owned, CEGCO , AES and QEPCO are private companies.
    • Transmission: A single state owned transmission company (NEPCO). It is also the system operator and is the only bulk supply licensee while single buyer model is in effect.
  • Distribution: 3 distribution companies (JEPCO, EDCO and IDECO). JEPCO privately owned. The other two (IDECO and EDCO) have been privatized on 2/07/2008

 

Natural Gas Market Structure

No Gas Market in Jordan

Current Energy Issues
  • Complete the Secondary Regulation documents.
  • Issuing the necessary instructions for Renewable Energy.
Contact

Mailing Address: P.O. Box 1865, Zip Code 11821 Jordan. 
Address: Jordan—Amman, Sweifieh - Building of Ministry of Energy and Mineral Resources - 5th & 6th Floors
Tel : (962 6) 5805000; Fax :(962 6) 5805003; 
Internet: www.erc.gov.jo

 Laws

  ERC Org. Chart

  Annual Report
  Grid Code
 
   Tariff Methodology